Thursday, September 27, 2012

G and S UPDATE

All the dings and lows have been glassed.
The logo, which is four logos
layed on top of each other
has been sanded and capped,
filler coated and sanded.

The rails and pinline have been sanded
and filler coated to protect the pinline.
All the repairs have been sanded.
The remaining lows have been built up.